Request for discussion: lowering the backlog of old Trac tickets.
Rainer Müller
raimue at macports.org
Mon Apr 30 22:52:26 UTC 2018
On 2018-04-30 21:09, Chris Jones wrote:
> I would also argue we are using the same system, for two different things. Short term bug reports and longer term 'work goals' are not the same, but we seem to mix them up in the same system. Maybe some way (label ?) to identify tickets that are going to be longer term is required ?
I would assume that bug reports would be short term and requests for new
ports or enhancements in a port are long term, but that distinction
already exists with the "Type" field. In which other cases would you
apply such a label/keyword?
Rainer
More information about the macports-dev
mailing list